Sign In | Join Free | My chinaqualitycrafts.com
China Chengdu Forster Technology Co., Ltd. logo
Chengdu Forster Technology Co., Ltd.
Integrity, pragmatism, innovation, and provide the best solution for your hydro power plant.
Active Member

5 Years

Home > High Head Water Turbine >

1000r/ Min 55kw -100kw Hydro Turbine / Micro Hydroelectric Turbine Unit

Chengdu Forster Technology Co., Ltd.

1000r/ Min 55kw -100kw Hydro Turbine / Micro Hydroelectric Turbine Unit

  • 1
  • 2

Place of Origin : China (Mainland)

Brand Name : Forster

Model Number : CJ237-W-45/1*4.5

Supply Ability : 50 Piece/Pieces per Month

Packaging Details : wood box

MOQ : 1 Piece/Pieces

Price : Negotiable

Certification : CE/TUV/ISO9001/From-E

Delivery Time : 120days

Type : water tubine

design head : 110-160m

traffic : 0.07-0.08m3/s

the output : 62.9-110kw

design speed : 1000r/min

the power of generator : 55-100KW

driving mode : straight league

diameter : 200mm

keyword : High Head Water Turbine

Port : shanghai/shenzhen

Contact Now

55kw - 100kw News High Head Water Turbine Generator for Hydro Power Plant

Our main products included:

1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series.

Product features:

Impingent turbine is a kind of hydraulic prime mover which USES the special water guide mechanism to draw out the free jet with kinetic energy, rush to the wheel bucket, and make the wheel rotate to do work, so as to complete the transformation of water energy into mechanical energy. In the impact-type turbine, according to the difference in the relative position and working times of working jet and runner, it can be divided into three types: cutting stroke turbine, oblique stroke turbine and double stroke turbine.

1. suitable for high head,small flow and flow changes in large runoff hydropower station.

2. With the power plant investment is small,compact units structure characteristics.

3. Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.

4. Suitable for high head,small flow station in mountainous area.

5. A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.

Product parameters:

CJ237-W-65/1x7.5 Hydro Tubine Performance Data And Supporting Table
Model Turbine Parameters Generator Parameters Driving mode Speed Way Water Intake
Design head(m) Under the design head Design speed (r/min) The power of generator Rated speed(r/min) Runaway speed(r/min) Vavel control Guide vane control Diameter (mm)
Flow rate (m3/s) The output(kw)
CJ237-W-65/1x7.5 50 0.134 53 410 55 750 1500 Direct connection or Belt connection automatic/Manual Z41H-2.5 300
60 0.148 69.7 150 55 750 1500 automatic/Manual
70 0.159 89.8 486 75 750 1650
80 0.17 108 520 100 500 900 automatic/Manual
90 0.181 129 550 125 600 1080
100 0.19 152 580 125 600 1080 automatic/Manual
110 0.199 174 610 160 600 1080
120 0.208 197 636 200 600 1080 automatic/Manual
130 0.214 220 662 200 600 1350
140 0.225 250 688 250 750 1350 automatic/Manual
150 0.233 279 713 250 750 1350
160 0.241 308 736 320 750 1350 automatic/Manual
170 0.248 355 758 320 750 1350
180 0.254 362 779 320 750 1350 automatic/Manual
190 0.262 390 800 400 750 1350
200 0.269 422 820 400 750 1350 automatic/Manual
210 0.275 448 840 400 750 1350
220 0.282 448 860 400 750 1350 automatic/Manual
230 0.288 518 880 500 1000 1800
240 0.294 557 900 500 1000 1800 automatic/Manual

Product pictuers:

1000r/ Min 55kw -100kw Hydro Turbine / Micro Hydroelectric Turbine Unit

1000r/ Min 55kw -100kw Hydro Turbine / Micro Hydroelectric Turbine Unit

Installation picture:

Company Information

Our workshop

Advantages

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.


Product Tags:

micro water turbine generator

      

hydroelectric turbine generator

      
Quality 1000r/ Min 55kw -100kw Hydro Turbine / Micro Hydroelectric Turbine Unit for sale

1000r/ Min 55kw -100kw Hydro Turbine / Micro Hydroelectric Turbine Unit Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Chengdu Forster Technology Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)